An early stage Clayton steam wagon, where the builder appears to have ordered a boiler then made the back axle.
Comprises one silver soldered copper boiler, one rear axle complete with pair of machined wheels and a set of drawings.
Boiler hydraulic tested at 200psi, certificate valid to July 2010.