Work to date is to a good standard - we'd put the engine at about 90% complete. It requires some platework including running boards, boiler fittings and wet header.
gauge | 3 1/2 inch |
length/inches | 36 + 18 |
width/inches | 7 |
height/inches | 10 1/2 |
weight/kg | 32 1/2 + 10 |
wheel material | cast iron |
axlebox type | needle roller |
cylinder material | cast iron |
valve type | piston |
valve gear | Walschaerts |
reverser type | screw |
lubricator type | mechanical |
working pressure/psi | 80 |
boiler type | locomotive with combustion chamber |
boiler material | copper |
boiler construction | silver soldered |
superheater(s) | 4 flues |
safety valve(s) | 2 |
safety valve type | spring |