An early stage LNER K2 4-6-0, the work of a prolific engineer responsible for, amongst other things, the GWR Metro and Hunslet styke "Conway" currently in stock.
Work to date comprises rolling chassis with cylinders and much of the motionwork, painted tender and silver soldered copper boiler.
gauge | 3 1/2 inch |