Work to date is to a good standard and includes a machined cylinder block complete with pistons, rods, crosshead, cylinder & valve chest covers - safety valve chimney and governor base casting are part-machined and fitted.
Complete with a quantity of unmachined castings, machined parts, nuts and studs.
The commercially built CE-marked boiler is by AJB Engineering, complete with manufacturer's test and conformity certificates.
scale | 4 inch |
length/inches | 89 |
width/inches | 35 |
height/inches | 48 |
weight/kg | est 865 (complete) |
cylinder material | cast iron |
boiler number | 313 |
year built | 2013 |
boiler maker | AJB Engineering |
CE mark | yes |
working pressure/psi | 170 |
boiler type | locomotive |
boiler material | steel |
boiler construction | welded, expanded tubes |