Currently in club test, the commercially built CE-marked boiler has had a hydraulic test since arriving with us and is in sound condition.
Overall the engine needs a variety of jobs doing - it's a winter overhaul job - including:
Not a five minute job to sort this one out, however a worthwhile project - the L1 is a handsomely proportioned engine, rather rare in this gauge.
If you need some inspiration, we sold a super 3 1/2 inch gauge version last year, pictures in the archive here.
gauge | 5 inch |
length/inches | 46 |
width/inches | 10 |
height/inches | 15 |
wheel material | cast iron |
axlebox type | plain bearing |
cylinder material | cast iron |
valve type | piston |
valve gear | Walschaerts |
reverser type | screw |
lubricator type | mechanical |
injector(s) | 2 |
boiler number | GB844 |
year built | 2019 |
boiler maker | GB Boiler Services |
CE mark | yes |
working pressure/psi | 80 |
boiler type | locomotive |
boiler material | copper |
boiler construction | silver soldered |
hydraulic test valid to | 6/Apr/23 |
steam test valid to | 24/May/22 |
superheater(s) | 4 |
superheater type | radiant |
safety valve(s) | 2 |
safety valve type | spring |
hand pump | 1 |
whistle | yes |