Please select your delivery country:
Online purchasing is only available to delivery addresses in the United Kingdom.
The engine steams freely and runs well - the boiler has had hydraulic and steam tests with new certification issued. Work carried out preparatory for the test included fitting of a new blowdown valve, injector and clack valve.
Paintwork is presentable if not of exhibition quality, it carries various running-related scratches as well as some deterioration to the finish at the top of the barrel immediately behind the chimney.
Supplied with firing irons, a starter kit of coal and steam oil and 12 months warranty. If required, we would be pleased to include a half day's training in the firing, driving and maintenance of the engine.
gauge | 5 inch |
length/inches | 37 |
width/inches | 10 |
height/inches | 16 |
weight/kg | 53 |
wheel material | cast iron |
axlebox type | plain bearing |
cylinder material | cast iron |
valve type | slide |
valve gear | Stephensons |
reverser type | pole |
injector(s) | 1 |
boiler number | PB785/08 |
year built | 2008 |
boiler maker | Priory Boilers |
CE mark | yes |
working pressure/psi | 90 |
boiler type | locomotive |
boiler material | copper |
boiler construction | silver soldered |
hydraulic test valid to | 18-Mar-2028 |
steam test valid to | 17-Jul-2025 |
superheater(s) | 1 |
superheater type | flue tube |
fusible plug | yes |
safety valve(s) | 2 |
safety valve type | spring |
mechanical pump | 1 |
hand pump | 1 |