A well-advanced 7 1/4 inch gauge Bagnall to the MJ Engineering design - work to date is to a high standard throughout, cylinders were commercially machined, the CE-marked boiler is by Gloucester Steam. Work to complete includes machining connecting and coupling rods, soldering the bottom into the brass saddle tank and provision of a cab - in terms of cost there is little left to be spent on the project to finish it.
Complete with a set of drawings.
Length 45 inches
gauge | 7 1/4 inch |