Please select your delivery country:
Online purchasing is only available to delivery addresses in the United Kingdom.
An early stage Standard Class 2, built to Martin Evans' design. The silver-soldered copper boiler is about 80% complete - it requires bushes, foundation ring and front tube plate soldering in. The tender is largely complete, with hand pump fitted, wheels and cylinders are machined to a good standard.
Complete with a set of drawings, parts and castings for this design are available from Blackgates Engineering.
gauge | 3 1/2 inch |