PARTS & ACCESSORIES
SECOND HAND
6981
An early stage part-built 3 1/2 inch gauge GWR Hall. Work to date comprise a rolling chassis, machined piston valve cylinders in gun metal, tube for smokebox with saddle casting, tender frames and wheelsets. There is a new, unused silver soldered copper boiler by Swindon Boilers - beautifully made, as you might imagine.
The small black cab roof that sneaked into one of the pictures is nothing to do with the Hall - my fault, half asleep when taking the pictures!
Type: Second hand
Tags: Projects
Stock code |
6981 |
Gauge |
3 1/2 inch |
Boiler type |
locomotive |
Boiler construction |
silver soldered |
Boiler material |
copper |
Working pressure |
90 |
CE/UKCA mark |
n/a - pre-2002 |
Boiler number |
89452 |
Date out |
Jan-17 |